IAI provided design-build-operate geotextile tube dewatering and water treatment services for this Remedial Action project. TSCA and Non-TSCA regulated sediments were processed separately in the same dewatering facility, at a flow rate of 3,000 gpm. The water treatment facility met the non-detect PCBs discharge limit throughout the project.
Stevens Point MGP Site Remedial Action Construction
IAI utilized its Mobile Water Treatment System to treat water at this former manufactured gas plant (MGP) site, processing up to 150 gpm of elutriate.
East Branch Grand Calumet River Remedial Action
IAI provided geotextile tube dewatering and water treatment services on this project, processing 145,000 cubic yards of PCB contaminated sediments and successfully treating and discharging 196 million gallons of water under an NPDES discharge permit.
Waukegan Harbor OU1 Remedial Action
IAI provided geotextile tube dewatering and water treatment operations and maintenance services for this environmental dredging project, to clean up PCBs contaminated sediment from the Waukegan Harbor, IL Superfund Site.
West Branch Grand Calumet River Remedial Action
IAI provided geotextile tube dewatering and water treatment services for this environmental dredging project, located near East Chicago, Indiana, processing 126,000 cubic yards of PCBs contaminated sediment.