The 2021 WEDA Midwest Chapter Meeting will be held online, March 18. IAI Construction Manager Scott Ponstein and Marketing Coordinator Amber Wilson are scheduled to co-present at this meeting, discussing water treatment for dredging projects. Please join us! IAI is pleased to sponsor the annual meeting of our local chapter, and to be a sustaining … [Read more...]
Portage Canal Segment 1 Dredging
Tailored Sediment Removal and Treatment Equipment Make a Big Impact on a Small Project “Use the correct tool for the job,” is a common construction safety rule, reminding us that the right equipment, used properly, will produce the safest, most efficient result. Not only is it important to use the right type of equipment, but also the right size. The … [Read more...]
Mill River Remediation
IAI provided geotextile tube dewatering and water treatment operations services for the Mill River Remediation Project (Fairfield, CT), and was additionally responsible for odor control during dredging operations. Work was performed over a three year period, from 2014 – 2016, with operations scheduled in dredging windows, to accommodate shellfish … [Read more...]
Stevens Point MGP Site Remedial Action Construction
Infrastructure Alternatives, Inc. (IAI) provided dredging water treatment services for this former manufactured gas plant (MGP) sediment cleanup project in Fall 2015, utilizing our Mobile Water Treatment System to process dredge material contact water or elutriate, storm water and truck wash water. IAI's Mobile Water Treatment System includes chemical … [Read more...]
Industrial Dredging Water Treatment
IAI provided water treatment services for this mechanical dredging project. The overall project involved excavating impacted sediments from service water ditches at an industrial facility in Michigan. IAI was responsible for treating after the remaining water after the ditches were drained to within one foot of the sediment, as well as any water that … [Read more...]
Ottawa River Remediation
IAI was the General Contractor for all landside operations on the Ottawa River Remediation Project, which was conducted over the course of the 2010 construction and dredging seasons. The project involved hydraulic dredging of 242,000 cubic yards of contaminated sediment from the Ottawa River near Toledo, Ohio. The dredged sediment was pumped by the … [Read more...]